Equipping of catering the federal government for Cardiovascular Surgery, Perm

/ Equipping of catering the federal government for Cardiovascular Surgery, Perm

Equipping of catering the federal government for Cardiovascular Surgery, Perm

Scope: easting Perm

Manufacturers:

Description

 

Equipping of catering the federal government for Cardiovascular Surgery, Perm
June 20, 2011 Mr. JSC "Dean International", won an open competition held by OAO "DEZZ" on equipping catering to the federal government for Cardiovascular Surgery, Perm and the provision of equipment for the catering department of the federal Center for Cardiovascular Surgery, d . Kaliningrad.
        In accordance with the Agreement, our company undertook the following work:
- Supply (including shipping and handling machinery) in the Federal Centers for subsequent equipment installation;
- Completed installation of equipment in the kitchens of Perm and Kaliningrad.
- Start-up operations carried out "in the blank" and "load" all the equipment;
In January 2012 the JSC "Dean International" will hold training / coaching professional user, as well as confirm the warranty of the equipment
Both the Federal Center consist of modular units mounted in accordance with the documentation.
Supplied by the Supplier for the equipment is installed in the facility design position in accordance with the documentation. Installation of all equipment is made in accordance with the manufacturer's instructions and equipment operating in the Russian regulatory documents by the company.
 Stages of work:
FTSSS Mr. Perm 21.12.11 1st floor:
1. Completed installation of equipment and hoods hot shop.
    Installed and connected washing equipment.
    Installed and connected boilers hot shop.
2. Distribution lines are collected and assembled.
3. All the furniture is arranged on one floor of the premises.
Ground floor:
1. Build cold storage and installation of refrigeration units.
At present, the site team of installers are in excess of 4 persons. Produced work on installation of washing machine tunnel type, placement and connection of the equipment room of washing pots and pans and vegetable shop. Full completion of construction is scheduled to December 25, 2011
Room sideboard:
All process equipment is connected and Pressed.
Completed assembly and placement of the bar and hall furniture

 

Equipping of catering the federal government for Cardiovascular Surgery, Perm

 

June 20, 2011 Mr. JSC "Dean International", won an open competition held by OAO "DEZZ" on equipping catering to the federal government for Cardiovascular Surgery, Perm and the provision of equipment for the catering department of the federal Center for Cardiovascular Surgery, d . Kaliningrad.

 

        In accordance with the Agreement, our company undertook the following work:

 

- Supply (including shipping and handling machinery) in the Federal Centers for subsequent equipment installation;

 

- Completed installation of equipment in the kitchens of Perm and Kaliningrad.

 

- Start-up operations carried out "in the blank" and "load" all the equipment;

 

In January 2012 the JSC "Dean International" will hold training / coaching professional user, as well as confirm the warranty of the equipment

 

Both the Federal Center consist of modular units mounted in accordance with the documentation.

 

Supplied by the Supplier for the equipment is installed in the facility design position in accordance with the documentation. Installation of all equipment is made in accordance with the manufacturer's instructions and equipment operating in the Russian regulatory documents by the company.

 

 Stages of work:

 

FTSSS Mr. Perm 21.12.11 1st floor:

 

1. Completed installation of equipment and hoods hot shop.

 

    Installed and connected washing equipment.

 

    Installed and connected boilers hot shop.

 

2. Distribution lines are collected and assembled.

 

3. All the furniture is arranged on one floor of the premises.

Ground floor:

1. Build cold storage and installation of refrigeration units.

 

At present, the site team of installers are in excess of 4 persons. Produced work on installation of washing machine tunnel type, placement and connection of the equipment room of washing pots and pans and vegetable shop. Full completion of construction is scheduled to December 25, 2011

Room sideboard:

 

 

All process equipment is connected and Pressed.

 

Completed assembly and placement of the bar and hall furniture